๐„๐š๐ซ๐ฅ๐ฒ ๐’๐ข๐ญ๐ž ๐๐š๐œ๐ค๐š๐ ๐ž

๐’๐จ๐Ÿ๐ญ๐›๐š๐ฅ๐ฅ & ๐๐š๐ฌ๐ž๐›๐š๐ฅ๐ฅ ๐…๐ข๐ž๐ฅ๐๐ฌ
โ€ข Concrete placed for batting cages
โ€ข Concrete placed for bleachers and press boxes
โ€ข Placement of ballfield mix
โ€ข Field irrigation system
โ€ข Outfield fencing
๐‚๐จ๐ง๐œ๐ž๐ฌ๐ฌ๐ข๐จ๐ง ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐ 
โ€ข Concrete placed for sidewalks and concession stand aprons
๐’๐ข๐ญ๐ž ๐–๐จ๐ซ๐ค
โ€ข Topsoil and hydroseed placed at hillsides and soccer practice fields
โ€ข Installation of ADA ramps and stairs at hillside

๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐  ๐๐š๐œ๐ค๐š๐ ๐ž

๐‚๐จ๐ง๐œ๐ซ๐ž๐ญ๐ž
โ€ข Completed Kitchen and Main Mechanical Rooms concrete slab on grade
โ€ข Prep for and place concrete slab on deck at Main Gymnasium south mezzanine completed
โ€ข Place concrete slab on grade at Area 4 J.H. locker areas and student areas completed
โ€ข Prep and place concrete stairs at PAC stage right and stage left ongoing
๐Œ๐š๐ฌ๐จ๐ง๐ซ๐ฒ
โ€ข CMU walls at Kitchen and Main Mechanical Rooms completed
โ€ข CMU veneer at Auxiliary gymnasium east wall completed
โ€ข CMU at Auxiliary Gymnasium north and east walls completed
โ€ข CMU walls at Auxiliary Gymnasium West Locker Rooms completed
โ€ข CMU walls at South Locker Rooms completed
โ€ข CMU walls at Area One Music Rooms and Back of House areas ongoing
โ€ข CMU at JH gymnasium west and south walls ongoing
๐’๐ญ๐ซ๐ฎ๐œ๐ญ๐ฎ๐ซ๐š๐ฅ ๐’๐ญ๐ž๐ž๐ฅ
โ€ข Structural steel erection at Main Gymnasium south mezzanine completed
โ€ข Structural steel erection at Area 3 Administration and Special Ed first and second floors completed
โ€ข Main gymnasium north mezzanine structural steel and decking installations ongoing
๐๐ฅ๐ฎ๐ฆ๐›๐ข๐ง๐  & ๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ
โ€ข MEP under slab installation at Area 4 J.H. locker areas and student areas completed
โ€ข MEP under slab installations at PAC stage area ongoing
๐‚๐š๐ซ๐ฉ๐ž๐ง๐ญ๐ซ๐ฒ
โ€ข Installation of treated lumber cap at PAC and Stage roof parapet walls ongoing

Side1
Side2
Side3
Side4

๐„๐š๐ซ๐ฅ๐ฒ ๐’๐ข๐ญ๐ž ๐๐š๐œ๐ค๐š๐ ๐ž
๐‚๐จ๐ง๐œ๐ž๐ฌ๐ฌ๐ข๐จ๐ง๐ฌ ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐ 
โ€ข Above ceiling electrical rough-in has been completed.
โ€ข The electrical room panels and transformer have been installed and wired.
โ€ข Lighting suspended in the acoustic grid and has been installed.
โ€ข Above ceiling mechanical has been completed.
โ€ข Toilet chase rough-in and above ceiling rough-in has been completed.
โ€ข Interior walls have been cleaned and painted.
โ€ข Drywall ceilings have been hung.
โ€ข Acoustical ceiling grid has been laid out and installed.
โ€ข Concrete frost slabs have been poured.
โ€ข Irrigation system supply piping is being installed.
๐ƒ๐ฎ๐ ๐จ๐ฎ๐ญ๐ฌ
โ€ข Metal roofing, trim & downspouts are nearing completion.
โ€ข Masonry has been painted.
โ€ข Concrete slabs/frost slabs have been poured.
โ€ข Doors and hardware have been installed.
๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ๐š๐ฅ ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐ 
โ€ข Metal roofing, trim & downspout are nearing completion.
โ€ข Concrete frost slab was poured.
โ€ข Door opening is being prepped for door and hardware placement.
๐’๐ข๐ญ๐ž๐ฐ๐จ๐ซ๐ค
โ€ข All storm piping has been completed.
โ€ข Storm structure inverts have been poured.
โ€ข The Bio-Retention pond at 546 has been excavated and media has been placed.
โ€ข Fine grade and topsoil have been placed on the south side of the property, around the detention pond and on the majority of the soccer fields.
โ€ข Grass seed is placed on the south side of the property and around the detention pond. Seed placement will continue north towards the new school building.
โ€ข The fire lane on the east side of the new school has been cut to grade and stoned.
โ€ข Installation of site conduits from the concession building to the dugouts, scoreboards, and future ball field lighting is in progress.

๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐  ๐๐š๐œ๐ค๐š๐ ๐ž
๐‚๐จ๐ง๐œ๐ซ๐ž๐ญ๐ž
โ€ข Elevator shaft foundations/pit slab and pit walls are complete.
โ€ข SOG prep and pour at Area 3 (admin) area is ongoing.
โ€ข SOG prep at Area 5 (high school academic) area is ongoing.
๐Œ๐š๐ฌ๐จ๐ง๐ซ๐ฒ
โ€ข CMU at PAC/stage north and west walls are complete.
โ€ข CMU from top of footing to FF elevation at entire perimeter of building is complete.
โ€ข Structural steel column base plates and grout is complete.
โ€ข CMU to roof height at Area 2 main electrical room is complete.
โ€ข Masonry veneer at PAC/stage north and west walls is ongoing.
โ€ข CMU at PAC/stage south wall is ongoing.
โ€ข CMU at main gymnasium walls is ongoing.
โ€ข CMU at JH gymnasium north and east walls is ongoing.
๐๐ฅ๐ฎ๐ฆ๐›๐ข๐ง๐ 
โ€ข Standard Plumbing has continued with the below slab installation of the sanitary lines, storm lines and acid waste lines in the Administration area, the kitchen, and education areas.
โ€ข Standard Plumbing has been working with Valentine Masonry coordinating all wall sleeves for future pipe installations and all wall openings for future duct installation.
๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ
โ€ข Speelman Electric has continued with the below slab installation of the feeder conduits from the main electrical rooms to sub locations and then all of the branch circuits for distribution.
โ€ข Speelman Electric has been working with Valentine Masonry coordinating all of the in- wall conduits for lighting, power, equipment, etc. as required.
โ€ข Speelman Electric has excavated, placed and backfilled site electrical conduits from the main building down the access road to Route 546. They have placed the light pole bases down the access road to Route 546.

Construction6.14 1
Construction6.14

๐„๐š๐ซ๐ฅ๐ฒ ๐’๐ข๐ญ๐ž ๐๐š๐œ๐ค๐š๐ ๐ž

๐‚๐จ๐ง๐œ๐ž๐ฌ๐ฌ๐ข๐จ๐ง๐ฌ ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐ 
โ€ข Above ceiling electrical rough-in has been completed.
โ€ข The electrical room panels and transformer have been installed and wired.
โ€ข Lighting suspended in the acoustic grid and has been installed.
โ€ข Above ceiling mechanical has been completed.
โ€ข Toilet chase rough-in and above ceiling rough-in has been completed.
โ€ข Interior walls have been cleaned and painted.
โ€ข Drywall ceilings have been hung.
โ€ข Acoustical ceiling grid has been laid out and installed.
โ€ข Concrete frost slabs have been poured.
โ€ข Irrigation system supply piping is being installed.

๐ƒ๐ฎ๐ ๐จ๐ฎ๐ญ๐ฌ
โ€ข Metal roofing, trim & downspouts are nearing completion.
โ€ข Masonry has been painted.
โ€ข Concrete slabs/frost slabs have been poured.
โ€ข Doors and hardware have been installed.

๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ๐š๐ฅ ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐ 
โ€ข Metal roofing, trim & downspout are nearing completion.
โ€ข Concrete frost slab was poured.
โ€ข Door opening is being prepped for door and hardware placement.

๐’๐ข๐ญ๐ž๐ฐ๐จ๐ซ๐ค
โ€ข All storm piping has been completed.
โ€ข Storm structure inverts have been poured.
โ€ข The Bio-Retention pond at 546 has been excavated and media has been placed.
โ€ข Fine grade and topsoil have been placed on the south side of the property, around the detention pond and on the majority of the soccer fields.
โ€ข Grass seed is placed on the south side of the property and around the detention pond. Seed placement will continue north towards the new school building.
โ€ข The fire lane on the east side of the new school has been cut to grade and stoned.
โ€ข Installation of site conduits from the concession building to the dugouts, scoreboards, and future ball field lighting is in progress.

๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐  ๐๐š๐œ๐ค๐š๐ ๐ž

๐‚๐จ๐ง๐œ๐ซ๐ž๐ญ๐ž
โ€ข Elevator shaft foundations/pit slab and pit walls are complete.
โ€ข SOG prep and pour at Area 3 (admin) area is ongoing.
โ€ข SOG prep at Area 5 (high school academic) area is ongoing.

๐Œ๐š๐ฌ๐จ๐ง๐ซ๐ฒ
โ€ข CMU at PAC/stage north and west walls are complete.
โ€ข CMU from top of footing to FF elevation at entire perimeter of building is complete.
โ€ข Structural steel column base plates and grout is complete.
โ€ข CMU to roof height at Area 2 main electrical room is complete.
โ€ข Masonry veneer at PAC/stage north and west walls is ongoing.
โ€ข CMU at PAC/stage south wall is ongoing.
โ€ข CMU at main gymnasium walls is ongoing.
โ€ข CMU at JH gymnasium north and east walls is ongoing.
 
๐๐ฅ๐ฎ๐ฆ๐›๐ข๐ง๐ 
โ€ข Standard Plumbing has continued with the below slab installation of the sanitary lines, storm lines and acid waste lines in the Administration area, the kitchen, and education areas.
โ€ข Standard Plumbing has been working with Valentine Masonry coordinating all wall sleeves for future pipe installations and all wall openings for future duct installation.
 
๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ
โ€ข Speelman Electric has continued with the below slab installation of the feeder conduits from the main electrical rooms to sub locations and then all of the branch circuits for distribution.
โ€ข Speelman Electric has been working with Valentine Masonry coordinating all of the in- wall conduits for lighting, power, equipment, etc. as required.
โ€ข Speelman Electric has excavated, placed and backfilled site electrical conduits from the main building down the access road to Route 546. They have placed the light pole bases down the access road to Route 546.
 
ConstructionUpdate5.6.21
ConstructionUpdate5.6.21 1

๐„๐š๐ซ๐ฅ๐ฒ ๐’๐ข๐ญ๐ž ๐๐š๐œ๐ค๐š๐ ๐ž

๐‚๐จ๐ง๐œ๐ž๐ฌ๐ฌ๐ข๐จ๐ง๐ฌ ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐ 
โ€ข Beaver Construction has formed and poured the slab on grade.
โ€ข The Valentine Masonry, with assistance from the electricians and plumbing contractor, have installed the interior CMU Walls.
โ€ข Valentine Masonry has caulked all of the interior masonry control joints in preparation of interior painting.
โ€ข The Whisler Plumbing Contractor has roughed in all sanitary & domestic lines required in the mechanical chase and concessions area.
โ€ข Advance Roofing has installed the asphalt shingles.
โ€ข Carter Electric has installed the AEP Metering System.
โ€ข Carter Electric has excavated and placed all power & technology conduits from AEP.

๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐ 
โ€ข Advance Roofing has installed the metal roofing system.
โ€ข Valentine Masonry has caulked all of the interior masonry control joints.

๐ƒ๐ฎ๐ ๐จ๐ฎ๐ญ๐ฌ
โ€ข Beaver Construction for all 4 dugouts has formed the slabs for the concrete floors.
โ€ข Valentine Masonry has caulked all of the interior masonry control joints in preparation of interior painting.

๐’๐จ๐Ÿ๐ญ๐›๐š๐ฅ๐ฅ ๐…๐ข๐ž๐ฅ๐
โ€ข Valentine Masonry has completed the knee wall between the dugouts.

๐๐š๐ฌ๐ž๐›๐š๐ฅ๐ฅ ๐…๐ข๐ž๐ฅ๐
โ€ข Valentine Masonry has completed the knee wall between the dugouts.

๐Ÿ•-๐Ÿ๐Ÿ ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐  ๐๐š๐œ๐ค๐š๐ ๐ž

๐‚๐จ๐ง๐œ๐ซ๐ž๐ญ๐ž
โ€ข All concrete foundations are now in place.
โ€ข Elevator shaft construction has begun.
โ€ข Backfill of footing ditches at Performing Arts Center (PAC) is ongoing.

๐Œ๐š๐ฌ๐จ๐ง๐ซ๐ฒ
โ€ข CMU from top of footing to finish floor elevation is complete at the following areas:
    โ€ข High School gymnasium perimeter
    โ€ข High School gymnasium south locker room
    โ€ข Auxiliary gymnasium perimeter
    โ€ข Auxiliary gymnasium west locker room
    โ€ข PAC walls and stage
    โ€ข Music rooms
    โ€ข Junior High gymnasium
โ€ข CMU from top of footing to finish floor is ongoing in the Junior High Gymnasium and Board Office areas.
โ€ข Performing Arts Center perimeter and stage CMU walls have begun.

๐๐ฅ๐ฎ๐ฆ๐›๐ข๐ง๐ 
โ€ข Below-slab sanitary for the west locker room area is complete.
โ€ข Below-slab sanitary for the south locker room area is complete.
โ€ข Below-slab sanitary for โ€œArea 4โ€ Middle School is complete.
โ€ข Currently installing the underdrain piping on the north side of the Performing Arts Center.
โ€ข Currently installing the below-slab storm piping that services the building Courtyard.
โ€ข Currently installing the sanitary lines that service the Kitchen area.
โ€ข Currently laying out and roughing in In-Wall Drains for the mason.

๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ
โ€ข Below-slab and in-wall electrical conduits in the main electrical room are ongoing.
โ€ข Below-slab feeders and branch conduits from the main electrical room to various points on the project are ongoing.
โ€ข Below-slab and in-wall electrical conduits in the sub electrical rooms are ongoing.
โ€ข Working with the masons to install wall boxes and conduit as masonry walls go up.

ConstructionUpdate4.6.21

ConstructionUpdate4.6.21 1

๐๐ž๐š๐ฏ๐ž๐ซ ๐‚๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐œ๐ญ๐ข๐จ๐ง
โ€ข Early sitework carpenters finished the rough carpentry on the concession building roof, softball visitorโ€™s dugout, and started the baseball visitorโ€™s dugout.
โ€ข Building package contractors began mobilizing equipment and materials. Courtyard 8โ€ storm line has been installed and backfilled. Rebar deliveries took place for Areas 1-6.

๐‚๐ฅ๐ž๐ฏ๐ž๐ฅ๐š๐ง๐ ๐‚๐ž๐ฆ๐ž๐ง๐ญ
โ€ข Workers began excavation for the Performing Arts Centerโ€™s sloped floor slab.
โ€ข Excavation and installation of concrete footings has taken place for the stage and perimeter wall, Area 1 Music rooms and back-of-house.

๐’๐ฉ๐ž๐ž๐ฅ๐ฆ๐š๐ง ๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ
โ€ข Started excavation for primary underground electrical pathways from the new school transformer to the main electrical room.
โ€ข Layout of all underground conduit feeds from the main electrical room to various locations in the building has begun.

๐’๐ญ๐š๐ง๐๐š๐ซ๐ ๐๐ฅ๐ฎ๐ฆ๐›๐ข๐ง๐  & ๐‡๐ž๐š๐ญ๐ข๐ง๐ 
โ€ข Layout of the underground storm and sanitary lines has begun. 

Construction3.11.21 2
Construction3.11.21 1

๐๐ž๐š๐ฏ๐ž๐ซ ๐‚๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐œ๐ญ๐ข๐จ๐ง
โ€ข ๐’๐ข๐ญ๐ž๐ฐ๐จ๐ซ๐ค ๐‚๐ซ๐ž๐ฐ:
   โ€ข Completed the storm cleanouts at the building pad
   โ€ข Installed the stone construction access โ€œRing Roadโ€ around the new building pad
   โ€ข Continued the storm piping at the south access road
   โ€ข Worked with the Village Water Department and State Fire Marshall to flush & hydro test the new water supply line and fire lines for the building.
โ€ข ๐‚๐š๐ซ๐ฉ๐ž๐ง๐ญ๐ž๐ซ๐ฌ:
   โ€ข Framed & sheathed the roofs for both the home baseball dugout & home softball dugout
   โ€ข Set and braced the trusses and framed the north overhang for the concession building
๐•๐š๐ฅ๐ž๐ง๐ญ๐ข๐ง๐ž ๐Œ๐š๐ฌ๐จ๐ง๐ซ๐ฒ
โ€ข Completed the masonry for all 4 dugouts
โ€ข Completed the perimeter masonry for the concession building
๐‚๐š๐ซ๐ญ๐ž๐ซ ๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ
โ€ข Continued to work with Valentine Masonry to rough in conduits for power/lighting/fire/communication at the concession building
โ€ข Installed the buried power & technology conduits from the school transformer location to the concession transformer location
โ€ข Worked with AEP to get poles/power installed down Clever Lane to the school property
โ€ข Worked with AEP to pull primary wiring from Clever Lane to the school transformer & concession transformer locations
โ€ข Worked with AEP to set both the school & concessions transformers
โ€ข Worked with AEP to power up the new school transformer and electrical building utilizing the new primary service; The football complex is no longer powered from the school, it is now supported by the new AEP electrical service.

ConstructionUpdate2 4 21 2

ConstructionUpdate2 4 21 3

ConstructionUpdate2 4 21 1

โ€ข Masonry on 3 of the 4 dugouts is 100% complete.
โ€ข Work on the concessions building masonry has started.

Steel
โ€ข Installation of the steel columns and roof support beams for the dugouts has started.

Site Work
โ€ข The storm piping around the new school building pad is 100% complete.
โ€ข The water line and fire hydrant loop are 100% complete.
โ€ข Fire department connection is 100% complete.
โ€ข The 8โ€ fire & 4โ€ domestic water line to the school building perimeter is 100% complete.

Electrical
โ€ข Below grade conduit & duct-bank from Clever Lane, through the recently installed transformer vault, to the new Electrical Building is complete.
โ€ข Electrical Building: Installation of electrical transformers, troughs, tubs, panels and controllers is 100% complete and in service
โ€ข The football complex temporary electrical cut over was successfully completed. This cut over allowed us to demolish the existing electrical building.
โ€ข The electricians have been working with the masons placing electrical conduits and boxes in/through the new masonry walls.

Demolition
โ€ข Eslich Wrecking was back on site to finish the demolition scope of the project. The work performed was demolition of the original electrical building. The demolition scope is now 100% Complete.

ConstructionUpdate1 6 211

ConstructionUpdate1 6 212

ConstructionUpdate1 6 213

๐‚๐š๐ซ๐ญ๐ž๐ซ ๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ
โ€ข Has installed the Electrical Duct Bank from Clever Lane to the location of the new AEP Transformer.
โ€ข They have started the rough in of the Electrical Equipment in the new Electrical Building. The new equipment in this Electrical Building will service the Football Stadium, Maintenance Areas and Field House.
โ€ข Has installed the below slab conduits at the Concessions Building.
โ€ข Working with AEP to bring new Electrical Service Down Clever Lane to the School Property.
โ€ข Working with Valentine Masonry to Rough in Conduits in the Masonry Walls.

๐–๐ก๐ข๐ฌ๐ฅ๐ž๐ซ ๐๐ฅ๐ฎ๐ฆ๐›๐ข๐ง๐  & ๐‡๐ž๐š๐ญ๐ข๐ง๐ 
โ€ข Whisler has installed all of the below slab plumbing and irrigation lines in the Concession Building.

๐•๐š๐ฅ๐ž๐ง๐ญ๐ข๐ง๐ž ๐Œ๐š๐ฌ๐จ๐ง๐ซ๐ฒ
โ€ข Has laid up enough block to bring the Concessions Building 2 courses above grade
โ€ข Softball Visitor Dugout is 100% Complete
โ€ข Baseball Visitor Dugout is 100% Complete
โ€ข The Softball & Baseball Knee Walls are in progress
โ€ข The Baseball Home Dugout is in progress
โ€ข The Softball Home Dugout has 1 course of block laid and will continue this week.

๐๐ž๐š๐ฏ๐ž๐ซ ๐„๐ฑ๐œ๐š๐ฏ๐š๐ญ๐จ๐ซ๐ฌ
โ€ข Sanitary Line is 100%
โ€ข Storm Lines are approximately 80%
โ€ข New Water Line is approximately 55%
โ€ข New School Building Pad is to Grade

Construction12 11 203

Construction12 111

Construction12 11 202

โ€ข The footers and base for the new concession stand has been roughed in where the new athletic fields will be
โ€ข The headwall has been placed for the detention pond beneath the new athletic fields
โ€ข Clever Lane was closed on October 24th to allow for the new water tap that will feed the new facility. The water and electric lines are being run next to the school and back to the construction site.
โ€ข The metering vault for the water line has delivered and placed in the upper high school/senior parking lot.
โ€ข The sanitary manhole has been installed near 546 to tie into the main sanitary line.

FacilitiesUpdate10 30 20